{"id":1573,"date":"2026-08-07T16:04:06","date_gmt":"2026-08-07T10:34:06","guid":{"rendered":"https:\/\/www.dhruvsoft.com\/blog\/?p=1573"},"modified":"2026-08-07T16:08:40","modified_gmt":"2026-08-07T10:38:40","slug":"migrate-hubspot-to-salesforce-without-losing-data","status":"publish","type":"post","link":"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/","title":{"rendered":"How to Migrate From HubSpot (or Any CRM) to Salesforce Without Losing Data or Momentum\u00a0"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>A step-by-step guide to planning, executing, and optimizing a successful CRM migration to Salesforce with minimal business disruption<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/How-to-Migrate-From-HubSpot-or-Any-CRM-to-Salesforce-Without-Losing-Data-or-Momentum.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"323\" src=\"https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/How-to-Migrate-From-HubSpot-or-Any-CRM-to-Salesforce-Without-Losing-Data-or-Momentum.png\" alt=\"How to Migrate From HubSpot (or Any CRM) to Salesforce Without Losing Data or Momentum\u00a0\" class=\"wp-image-1574\" title=\"How to Migrate From HubSpot (or Any CRM) to Salesforce Without Losing Data or Momentum\u00a0\" srcset=\"https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/How-to-Migrate-From-HubSpot-or-Any-CRM-to-Salesforce-Without-Losing-Data-or-Momentum.png 1024w, https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/How-to-Migrate-From-HubSpot-or-Any-CRM-to-Salesforce-Without-Losing-Data-or-Momentum-300x95.png 300w, https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/How-to-Migrate-From-HubSpot-or-Any-CRM-to-Salesforce-Without-Losing-Data-or-Momentum-768x242.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At some point, most growing businesses hit a wall with their existing CRM. Reports take too long to build, sales and service teams work off different versions of the truth, and processes that once fit on a single spreadsheet now need real automation. These are the classic signs that a CRM has reached its limits, and they are exactly why so many companies begin evaluating a move to Salesforce.<\/p>\n\n\n\n<!--more-->\n\n\n\n<p class=\"wp-block-paragraph\">Businesses migrate from HubSpot, Microsoft Dynamics, Zoho CRM, Pipedrive, Fresh-sales, and various legacy CRM systems for similar reasons: limited customization, weak reporting, poor scalability across departments, and a lack of deep integration with the other systems running the business. In many cases, the CRM was a good fit when the company was smaller, but it was never designed to support multiple departments, complex approval processes, or the volume of data a scaling business now generates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The catch is that a CRM migration is a high-stakes project. Done without a plan, it can mean lost records, broken relationships between accounts and contacts, frustrated sales teams, and weeks of disrupted pipeline visibility. Sales reps who cannot find historical context on a customer lose credibility in front of that customer. Service teams that lose case history end up repeating questions customers have already answered. These are not small inconveniences; they show up directly in revenue, retention, and team morale.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Salesforce remains the platform of choice for businesses planning for scalable growth, thanks to its flexibility, its mature ecosystem of integrations, and its ability to support sales, service, and marketing on a single platform. It also offers a depth of customization, AI capability, and partner ecosystem that most point-solution CRMs simply cannot match as a business grows more complex. This guide walks through exactly how to migrate from HubSpot, or any other CRM, to Salesforce without losing data or business momentum along the way, so you can approach the project with a clear roadmap rather than guesswork.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 ez-toc-wrap-left-text counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#When_Is_the_Right_Time_to_Migrate\" >When Is the Right Time to Migrate?&nbsp;&nbsp;&nbsp;<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Business_Growth_Has_Outpaced_Your_CRM\" >Business Growth Has Outpaced Your CRM&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Need_for_Greater_Automation\" >Need for Greater Automation&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Integration_Challenges\" >Integration Challenges&nbsp;&nbsp;&nbsp;<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Common_CRM_Migration_Challenges\" >Common CRM Migration Challenges&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Pre-Migration_Assessment_Build_a_Migration_Strategy\" >Pre-Migration Assessment: Build a Migration Strategy&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Salesforce_Migration_Roadmap\" >Salesforce Migration Roadmap&nbsp;&nbsp;&nbsp;<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Step_1_Audit_Existing_CRM_Data\" >Step 1: Audit Existing CRM Data&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Step_2_Design_Your_Salesforce_Data_Model\" >Step 2: Design Your Salesforce Data Model&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Step_3_Map_Source_CRM_Fields_to_Salesforce\" >Step 3: Map Source CRM Fields to Salesforce&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Step_4_Clean_and_Transform_Data\" >Step 4: Clean and Transform Data&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Step_5_Plan_Integrations\" >Step 5: Plan Integrations&nbsp;&nbsp;<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#CRM_Data_Mapping_What_Needs_to_Be_Migrated\" >CRM Data Mapping: What Needs to Be Migrated?&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Maintaining_Data_Integrity_During_Migration\" >Maintaining Data Integrity During Migration&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Avoiding_Business_Disruption_During_Migration\" >Avoiding Business Disruption During Migration&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#User_Adoption_Prevent_Losing_Business_Momentum\" >User Adoption: Prevent Losing Business Momentum&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Optimizing_Salesforce_After_Migration\" >Optimizing Salesforce After Migration&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Common_CRM_Migration_Mistakes\" >Common CRM Migration Mistakes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Migration_Best_Practices_Checklist\" >Migration Best Practices Checklist<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Conclusion\" >Conclusion&nbsp;&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Frequently_Asked_Questions_FAQs\" >Frequently Asked Questions (FAQs)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/www.dhruvsoft.com\/blog\/migrate-hubspot-to-salesforce-without-losing-data\/#Start_Your_Salesforce_Migration_Journey\" >Start Your Salesforce Migration Journey&nbsp;&nbsp;&nbsp;<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"When_Is_the_Right_Time_to_Migrate\"><\/span><strong>When Is the Right Time to Migrate?<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Business_Growth_Has_Outpaced_Your_CRM\"><\/span><strong>Business Growth Has Outpaced Your CRM<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If your organization now has more users and departments relying on the CRM than it was originally set up for, if customer data volume has grown well beyond what the system comfortably handles, or if your sales and service processes have become too complex for your current tool, these are strong signals that it is time to consider a Salesforce CRM migration.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Need_for_Greater_Automation\"><\/span><strong>Need for Greater Automation<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Many teams outgrow their CRM&#8217;s automation capabilities before they outgrow the CRM itself. Once you need advanced workflow automation, AI-driven insights into deals and customer behavior, or better collaboration across multiple departments, a more capable platform like Salesforce becomes necessary.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Integration_Challenges\"><\/span><strong>Integration Challenges<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A CRM that cannot integrate cleanly with your ERP, marketing platforms, customer support systems, or other third-party applications creates data silos and manual work. When integration limitations start slowing the business down, migrating to a more extensible platform is usually the more sustainable path forward.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Common_CRM_Migration_Challenges\"><\/span><strong>Common CRM Migration Challenges<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Understanding the common pitfalls of a CRM migration up front makes it far easier to plan around them. Most migration failures trace back to one of the following six issues.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Data Loss<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Records can be dropped or corrupted during extraction, transformation, or load if the process is not carefully planned and validated at every step. This is often the single biggest fear businesses have going into a migration, and rightly so, since lost records can mean lost revenue history or broken customer relationships.<\/li>\n\n\n\n<li><strong>Duplicate Records<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Migrating data as-is, without deduplication, often carries years of duplicate contacts and accounts directly into the new system, undermining reporting accuracy and creating confusion for sales teams working the same account under two different records.<\/li>\n\n\n\n<li><strong>Broken Relationships Between Objects<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Losing the connections between accounts, contacts, and opportunities during migration can leave sales teams without the context they rely on daily, effectively erasing the relationship history that makes a CRM useful in the first place.<\/li>\n\n\n\n<li><strong>User Resistance<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Teams that are not involved early or trained properly often resist adopting the new system, undermining the return on investment regardless of how well the technical migration itself was executed.<\/li>\n\n\n\n<li><strong>Business Downtime<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Poorly sequenced migrations can interrupt access to active pipeline and customer data at exactly the wrong moment, stalling deals in progress and frustrating customer-facing teams.<\/li>\n\n\n\n<li><strong>Poor Data Quality<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Migrating incomplete, outdated, or inconsistent data simply moves old problems into a new system rather than solving them, and often makes those problems harder to fix once they are embedded in Salesforce&#8217;s data model.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Pre-Migration_Assessment_Build_a_Migration_Strategy\"><\/span><strong>Pre-Migration Assessment: Build a Migration Strategy<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Evaluate Your Current CRM<\/strong>: Before mapping anything to Salesforce, take stock of everything living in your current CRM, including:\n<ul class=\"wp-block-list\">\n<li>Contacts<\/li>\n\n\n\n<li>Companies or accounts<\/li>\n\n\n\n<li>Deals or opportunities<\/li>\n\n\n\n<li>Activities<\/li>\n\n\n\n<li>Tasks<\/li>\n\n\n\n<li>Custom objects<\/li>\n\n\n\n<li>Attachments<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Define Business Goals<\/strong>&nbsp;&nbsp;<strong>: <\/strong>A migration should be anchored to clear business goals rather than treated as a purely technical exercise. Be explicit about why you are migrating, what success will look like, and how the new platform needs to support the business as it scales.<\/li>\n\n\n\n<li><strong>Identify Stakeholders<\/strong>&nbsp;&nbsp;<strong>: <\/strong>A successful migration requires input from every team that touches customer data, including sales, marketing, customer service, IT, and executive leadership. Involving these stakeholders early reduces surprises later and builds buy-in for the new system.&nbsp;<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Salesforce_Migration_Roadmap\"><\/span><strong>Salesforce Migration Roadmap<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Once the pre-migration assessment is complete, the actual migration work follows a fairly predictable sequence. Skipping or rushing any of these steps is where most CRM migration problems originate, so it is worth treating each one as a distinct phase with its own checkpoint before moving forward.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><a href=\"https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/Salesforce-Migration-Roadmap.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/Salesforce-Migration-Roadmap-1024x576.png\" alt=\"Salesforce Migration Roadmap\" class=\"wp-image-1575\" style=\"width:731px;height:auto\" title=\"Salesforce Migration Roadmap\" srcset=\"https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/Salesforce-Migration-Roadmap-1024x576.png 1024w, https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/Salesforce-Migration-Roadmap-300x169.png 300w, https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/Salesforce-Migration-Roadmap-768x432.png 768w, https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/Salesforce-Migration-Roadmap-1536x864.png 1536w, https:\/\/www.dhruvsoft.com\/blog\/wp-content\/uploads\/2026\/08\/Salesforce-Migration-Roadmap.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/div>\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Step_1_Audit_Existing_CRM_Data\"><\/span><strong>Step 1: Audit Existing CRM Data<\/strong>&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Start by removing duplicates, archiving obsolete records, validating that mandatory fields are populated, and standardizing formats across the dataset. A clean starting point makes every later step easier.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Step_2_Design_Your_Salesforce_Data_Model\"><\/span><strong>Step 2: Design Your Salesforce Data Model<\/strong>&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Define how your business will be structured in Salesforce, including accounts, contacts, leads, opportunities, cases, products, and any custom objects specific to your operations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Step_3_Map_Source_CRM_Fields_to_Salesforce\"><\/span><strong>Step 3: Map Source CRM Fields to Salesforce<\/strong>&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Carefully map standard fields, custom fields, picklists, relationships, and file attachments from your source CRM to their Salesforce equivalents. This is one of the most detail-intensive parts of any CRM data migration.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Step_4_Clean_and_Transform_Data\"><\/span><strong>Step 4: Clean and Transform Data<\/strong>&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Standardize naming conventions, normalize addresses, merge duplicate accounts, and validate email addresses before the data is loaded into Salesforce.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Step_5_Plan_Integrations\"><\/span><strong>Step 5: Plan Integrations<\/strong>&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Map out how Salesforce will connect with your ERP, marketing automation platform, email system, accounting software, customer support tools, and document management systems, so nothing breaks on go-live day.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"CRM_Data_Mapping_What_Needs_to_Be_Migrated\"><\/span><strong>CRM Data Mapping: What Needs to Be Migrated?<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The table below outlines a typical field and object mapping when migrating from a CRM like HubSpot to Salesforce, along with the key considerations for each.<\/p>\n\n\n\n<!DOCTYPE html>\n<html>\n<head>\n<style>\n  .comparison-table-container {\n    font-family: Arial, sans-serif;\n    margin-top: 20px;\n    overflow-x: auto;\n  }\n\n  .comparison-table {\n    width: 100%;\n    min-width: 1100px;\n    border-collapse: collapse;\n  }\n\n  .comparison-table th {\n    background-color: #009de8;\n    color: #ffffff;\n    padding: 14px;\n    text-align: left;\n    font-size: 15px;\n  }\n\n  .comparison-table td {\n    padding: 14px;\n    border: 1px solid #eaeff4;\n    vertical-align: top;\n    background-color: #f9fbfd;\n    font-size: 14px;\n    line-height: 1.6;\n  }\n\n  .comparison-table tr:nth-child(even) td {\n    background-color: #eaeff4;\n  }\n\n  .comparison-table td:first-child {\n    font-weight: bold;\n    width: 25%;\n  }\n\n  .comparison-table td:nth-child(2) {\n    width: 25%;\n  }\n\n  .comparison-table td:nth-child(3) {\n    width: 50%;\n  }\n<\/style>\n<\/head>\n\n<body>\n\n<div class=\"comparison-table-container\">\n\n<table class=\"comparison-table\">\n\n  <thead>\n    <tr>\n      <th>Source CRM Data<\/th>\n      <th>Salesforce Object<\/th>\n      <th>Migration Considerations<\/th>\n    <\/tr>\n  <\/thead>\n\n  <tbody>\n\n    <tr>\n      <td>Contacts<\/td>\n      <td>Contacts<\/td>\n      <td>Remove duplicates and validate email addresses.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Companies<\/td>\n      <td>Accounts<\/td>\n      <td>Standardize company hierarchy before migration.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Deals<\/td>\n      <td>Opportunities<\/td>\n      <td>Preserve sales stages, close dates, and opportunity values.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Leads<\/td>\n      <td>Leads<\/td>\n      <td>Retain lead source, ownership, and qualification status.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Tasks<\/td>\n      <td>Activities<\/td>\n      <td>Maintain activity timelines, due dates, and ownership.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Notes<\/td>\n      <td>Notes<\/td>\n      <td>Preserve historical notes and business context.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Emails<\/td>\n      <td>Activities<\/td>\n      <td>Retain communication history wherever possible.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Products<\/td>\n      <td>Products<\/td>\n      <td>Validate the product catalog, SKUs, and pricing before migration.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Custom Fields<\/td>\n      <td>Custom Fields<\/td>\n      <td>Review field necessity and optimize the data model.<\/td>\n    <\/tr>\n\n    <tr>\n      <td>Attachments<\/td>\n      <td>Files<\/td>\n      <td>Ensure files remain accessible and correctly linked after migration.<\/td>\n    <\/tr>\n\n  <\/tbody>\n\n<\/table>\n\n<\/div>\n\n<\/body>\n<\/html>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Maintaining_Data_Integrity_During_Migration\"><\/span><strong>Maintaining Data Integrity During Migration<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Preserve Relationships<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Account-contact associations, opportunity ownership, and parent-child records all need to carry over intact, or sales and service teams will lose critical context the moment they log into Salesforce.<\/li>\n\n\n\n<li><strong>Validate Data Accuracy<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Verify record counts between the source system and Salesforce, confirm field mappings are correct, and test a representative sample of records in detail before considering the migration complete.<\/li>\n\n\n\n<li><strong>Maintain Historical Data<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Activities, notes, closed opportunities, and past customer interactions carry real business value. A well-planned migration preserves this history rather than starting teams off with a blank slate.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Avoiding_Business_Disruption_During_Migration\"><\/span><strong>Avoiding Business Disruption During Migration<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Phased Migration Approach<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Rather than migrating everything at once, moving data and processes in phases reduces risk and makes issues easier to isolate and fix.<\/li>\n\n\n\n<li><strong>Sandbox Testing<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Every migration should be tested thoroughly in a Salesforce Sandbox before touching production data, allowing issues to be caught and corrected without business impact.<\/li>\n\n\n\n<li><strong>Parallel Validation<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Running the old and new systems in parallel for a short period allows teams to cross-check data and catch discrepancies before fully cutting over.<\/li>\n\n\n\n<li><strong>Rollback Planning<\/strong>&nbsp;&nbsp;<strong>: <\/strong>A clear rollback plan ensures that if something goes wrong during go-live, the business can revert without losing data or grinding to a halt.<\/li>\n\n\n\n<li><strong>Communication Plan<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Keeping every affected team informed about migration timelines, what to expect, and who to contact with issues reduces confusion and resistance during the transition.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"User_Adoption_Prevent_Losing_Business_Momentum\"><\/span><strong>User Adoption: Prevent Losing Business Momentum<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Role-Based Training<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Sales, service, and marketing teams each use Salesforce differently, so training should be tailored to how each role will actually work in the new system.<\/li>\n\n\n\n<li><strong>Updated Sales Processes<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Migration is a natural opportunity to refine sales and service processes rather than simply replicating old habits inside a new platform.<\/li>\n\n\n\n<li><strong>Documentation<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Clear, accessible documentation gives users a reference point after go-live, reducing dependence on IT for routine questions.<\/li>\n\n\n\n<li><strong>Executive Sponsorship<\/strong>&nbsp;&nbsp;<strong>: <\/strong>Visible support from leadership signals that the migration matters and encourages teams to fully commit to the new system.<\/li>\n\n\n\n<li><strong>Hyper-care Support After Go-Live<\/strong>&nbsp;&nbsp;<strong>: <\/strong>A dedicated support period immediately after go-live helps resolve issues quickly, before they erode confidence in the new platform.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Optimizing_Salesforce_After_Migration\"><\/span><strong>Optimizing Salesforce After Migration<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Workflow Automation<\/strong>&nbsp;&nbsp;<strong>:<\/strong> Once data is safely in Salesforce, automation can be layered in for lead assignment, opportunity updates, and case routing, reducing manual work across teams.<\/li>\n\n\n\n<li><strong>Reports and Dashboards<\/strong>&nbsp;&nbsp;<strong>:<\/strong> Purpose-built dashboards for executives, sales pipeline tracking, and customer service KPIs give every team visibility into the metrics that matter most to them.<\/li>\n\n\n\n<li><strong>AI and Predictive Insights<\/strong>&nbsp;&nbsp;<strong>:<\/strong> Salesforce&#8217;s AI capabilities can be used for opportunity scoring, forecasting, and customer intelligence, turning migrated historical data into a genuine strategic asset.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Common_CRM_Migration_Mistakes\"><\/span><strong>Common CRM Migration Mistakes<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Migrating poor-quality data as-is<\/li>\n\n\n\n<li>Replicating outdated processes inside the new system<\/li>\n\n\n\n<li>Ignoring user adoption and change management<\/li>\n\n\n\n<li>Underestimating data mapping complexity<\/li>\n\n\n\n<li>Skipping testing and validation<\/li>\n\n\n\n<li>Failing to document integrations<\/li>\n\n\n\n<li>No post-migration optimization plan<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Migration_Best_Practices_Checklist\"><\/span><strong>Migration Best Practices Checklist<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Conduct a comprehensive CRM audit<\/li>\n\n\n\n<li>Clean data before migration<\/li>\n\n\n\n<li>Map every field and object carefully<\/li>\n\n\n\n<li>Test in a Salesforce Sandbox<\/li>\n\n\n\n<li>Validate migrated records thoroughly<\/li>\n\n\n\n<li>Train users before go-live<\/li>\n\n\n\n<li>Monitor performance after deployment<\/li>\n\n\n\n<li>Continuously optimize Salesforce<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A successful CRM migration is about far more than moving records from one system to another. Done well, it is an opportunity to improve processes, strengthen user adoption, and build a scalable foundation the business can grow on for years to come. It is also a chance to leave behind years of accumulated data debt and start fresh with structure that actually reflects how your teams work today.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With careful planning, thorough testing, and a phased implementation approach, organizations can migrate to Salesforce without losing valuable data or disrupting day-to-day operations. Partnering with an experienced Salesforce implementation team helps minimize risk at every stage and accelerates how quickly the business sees value from the new platform, so the migration becomes a launchpad for growth rather than a disruptive one-time project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions_FAQs\"><\/span><strong>Frequently Asked Questions (FAQs)<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-esab-accordion esab-o48pwgtr\" data-mode=\"global\"><div class=\"esab__container\">\n<div class=\"wp-block-esab-accordion-child\"><div class=\"esab__head\" role=\"button\" aria-expanded=\"false\"><div class=\"esab__heading_txt\"><p class=\"esab__heading_tag\"><strong>How long does a Salesforce CRM migration typically take?<\/strong>\u00a0<\/p><\/div><div class=\"esab__icon\"><div class=\"esab__collapse\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m3.5 20.5c-4.7-4.7-4.7-12.3 0-17 4.7-4.7 12.3-4.7 17 0 4.6 4.7 4.6 12.3 0 17-4.7 4.6-12.3 4.6-17 0zm0.9-0.9c4.2 4.2 11 4.2 15.2 0 4.2-4.2 4.2-11 0-15.2-4.2-4.3-11-4.3-15.2 0-4.3 4.2-4.3 11 0 15.2z\"><\/path><path d=\"m11.4 15.9v-3.3h-3.3c-0.3 0-0.6-0.3-0.6-0.6 0-0.4 0.3-0.6 0.6-0.6h3.3v-3.3c0-0.3 0.3-0.6 0.6-0.6 0.3 0 0.6 0.3 0.6 0.6v3.3h3.3c0.3 0 0.6 0.2 0.6 0.6q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2h-3.3v3.3q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2c-0.4 0-0.6-0.3-0.6-0.6z\"><\/path><\/svg> <\/div><div class=\"esab__expand\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m12 24c-6.6 0-12-5.4-12-12 0-6.6 5.4-12 12-12 6.6 0 12 5.4 12 12 0 6.6-5.4 12-12 12zm10.6-12c0-5.9-4.7-10.6-10.6-10.6-5.9 0-10.6 4.7-10.6 10.6 0 5.9 4.7 10.6 10.6 10.6 5.9 0 10.6-4.7 10.6-10.6z\"><\/path><path d=\"m5.6 11.3h12.8v1.4h-12.8z\"><\/path><\/svg> <\/div><\/div><\/div><div class=\"esab__body\">\n<p class=\"wp-block-paragraph\">Timelines vary based on data volume, complexity, and the number of integrations involved, but most mid-sized migrations take anywhere from a few weeks to a few months from discovery through hyper-care. A straightforward migration with clean data and few integrations can move faster, while a migration involving multiple business units or heavy customization will naturally take longer to plan and test properly.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-esab-accordion-child\"><div class=\"esab__head\" role=\"button\" aria-expanded=\"false\"><div class=\"esab__heading_txt\"><p class=\"esab__heading_tag\"><strong>Can historical emails, notes, and activities be migrated?<\/strong>\u00a0\u00a0<\/p><\/div><div class=\"esab__icon\"><div class=\"esab__collapse\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m3.5 20.5c-4.7-4.7-4.7-12.3 0-17 4.7-4.7 12.3-4.7 17 0 4.6 4.7 4.6 12.3 0 17-4.7 4.6-12.3 4.6-17 0zm0.9-0.9c4.2 4.2 11 4.2 15.2 0 4.2-4.2 4.2-11 0-15.2-4.2-4.3-11-4.3-15.2 0-4.3 4.2-4.3 11 0 15.2z\"><\/path><path d=\"m11.4 15.9v-3.3h-3.3c-0.3 0-0.6-0.3-0.6-0.6 0-0.4 0.3-0.6 0.6-0.6h3.3v-3.3c0-0.3 0.3-0.6 0.6-0.6 0.3 0 0.6 0.3 0.6 0.6v3.3h3.3c0.3 0 0.6 0.2 0.6 0.6q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2h-3.3v3.3q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2c-0.4 0-0.6-0.3-0.6-0.6z\"><\/path><\/svg> <\/div><div class=\"esab__expand\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m12 24c-6.6 0-12-5.4-12-12 0-6.6 5.4-12 12-12 6.6 0 12 5.4 12 12 0 6.6-5.4 12-12 12zm10.6-12c0-5.9-4.7-10.6-10.6-10.6-5.9 0-10.6 4.7-10.6 10.6 0 5.9 4.7 10.6 10.6 10.6 5.9 0 10.6-4.7 10.6-10.6z\"><\/path><path d=\"m5.6 11.3h12.8v1.4h-12.8z\"><\/path><\/svg> <\/div><\/div><\/div><div class=\"esab__body\">\n<p class=\"wp-block-paragraph\">Yes. With proper planning, historical emails, notes, and activity records can be migrated into Salesforce so teams retain full context on every account and contact rather than starting relationships over a blank history.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-esab-accordion-child\"><div class=\"esab__head\" role=\"button\" aria-expanded=\"false\"><div class=\"esab__heading_txt\"><p class=\"esab__heading_tag\"><strong>Will there be downtime during migration?<\/strong>\u00a0\u00a0<\/p><\/div><div class=\"esab__icon\"><div class=\"esab__collapse\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m3.5 20.5c-4.7-4.7-4.7-12.3 0-17 4.7-4.7 12.3-4.7 17 0 4.6 4.7 4.6 12.3 0 17-4.7 4.6-12.3 4.6-17 0zm0.9-0.9c4.2 4.2 11 4.2 15.2 0 4.2-4.2 4.2-11 0-15.2-4.2-4.3-11-4.3-15.2 0-4.3 4.2-4.3 11 0 15.2z\"><\/path><path d=\"m11.4 15.9v-3.3h-3.3c-0.3 0-0.6-0.3-0.6-0.6 0-0.4 0.3-0.6 0.6-0.6h3.3v-3.3c0-0.3 0.3-0.6 0.6-0.6 0.3 0 0.6 0.3 0.6 0.6v3.3h3.3c0.3 0 0.6 0.2 0.6 0.6q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2h-3.3v3.3q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2c-0.4 0-0.6-0.3-0.6-0.6z\"><\/path><\/svg> <\/div><div class=\"esab__expand\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m12 24c-6.6 0-12-5.4-12-12 0-6.6 5.4-12 12-12 6.6 0 12 5.4 12 12 0 6.6-5.4 12-12 12zm10.6-12c0-5.9-4.7-10.6-10.6-10.6-5.9 0-10.6 4.7-10.6 10.6 0 5.9 4.7 10.6 10.6 10.6 5.9 0 10.6-4.7 10.6-10.6z\"><\/path><path d=\"m5.6 11.3h12.8v1.4h-12.8z\"><\/path><\/svg> <\/div><\/div><\/div><div class=\"esab__body\">\n<p class=\"wp-block-paragraph\">A well-planned, phased migration with sandbox testing and parallel validation is designed to minimize downtime, and in most cases, active teams can continue working with little to no interruption. Any cut-over windows are typically scheduled outside peak business hours to reduce impact further.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-esab-accordion-child\"><div class=\"esab__head\" role=\"button\" aria-expanded=\"false\"><div class=\"esab__heading_txt\"><p class=\"esab__heading_tag\"><strong>How can duplicate records be prevented?<\/strong>\u00a0\u00a0<\/p><\/div><div class=\"esab__icon\"><div class=\"esab__collapse\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m3.5 20.5c-4.7-4.7-4.7-12.3 0-17 4.7-4.7 12.3-4.7 17 0 4.6 4.7 4.6 12.3 0 17-4.7 4.6-12.3 4.6-17 0zm0.9-0.9c4.2 4.2 11 4.2 15.2 0 4.2-4.2 4.2-11 0-15.2-4.2-4.3-11-4.3-15.2 0-4.3 4.2-4.3 11 0 15.2z\"><\/path><path d=\"m11.4 15.9v-3.3h-3.3c-0.3 0-0.6-0.3-0.6-0.6 0-0.4 0.3-0.6 0.6-0.6h3.3v-3.3c0-0.3 0.3-0.6 0.6-0.6 0.3 0 0.6 0.3 0.6 0.6v3.3h3.3c0.3 0 0.6 0.2 0.6 0.6q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2h-3.3v3.3q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2c-0.4 0-0.6-0.3-0.6-0.6z\"><\/path><\/svg> <\/div><div class=\"esab__expand\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m12 24c-6.6 0-12-5.4-12-12 0-6.6 5.4-12 12-12 6.6 0 12 5.4 12 12 0 6.6-5.4 12-12 12zm10.6-12c0-5.9-4.7-10.6-10.6-10.6-5.9 0-10.6 4.7-10.6 10.6 0 5.9 4.7 10.6 10.6 10.6 5.9 0 10.6-4.7 10.6-10.6z\"><\/path><path d=\"m5.6 11.3h12.8v1.4h-12.8z\"><\/path><\/svg> <\/div><\/div><\/div><div class=\"esab__body\">\n<p class=\"wp-block-paragraph\">Running deduplication during the data audit phase, combined with validation rules and matching logic during load, significantly reduces duplicate records in the new system. Ongoing deduplication rules within Salesforce also help keep the data clean after go-live.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-esab-accordion-child\"><div class=\"esab__head\" role=\"button\" aria-expanded=\"false\"><div class=\"esab__heading_txt\"><p class=\"esab__heading_tag\"><strong>Can custom fields and workflows be migrated?<\/strong>\u00a0\u00a0<\/p><\/div><div class=\"esab__icon\"><div class=\"esab__collapse\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m3.5 20.5c-4.7-4.7-4.7-12.3 0-17 4.7-4.7 12.3-4.7 17 0 4.6 4.7 4.6 12.3 0 17-4.7 4.6-12.3 4.6-17 0zm0.9-0.9c4.2 4.2 11 4.2 15.2 0 4.2-4.2 4.2-11 0-15.2-4.2-4.3-11-4.3-15.2 0-4.3 4.2-4.3 11 0 15.2z\"><\/path><path d=\"m11.4 15.9v-3.3h-3.3c-0.3 0-0.6-0.3-0.6-0.6 0-0.4 0.3-0.6 0.6-0.6h3.3v-3.3c0-0.3 0.3-0.6 0.6-0.6 0.3 0 0.6 0.3 0.6 0.6v3.3h3.3c0.3 0 0.6 0.2 0.6 0.6q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2h-3.3v3.3q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2c-0.4 0-0.6-0.3-0.6-0.6z\"><\/path><\/svg> <\/div><div class=\"esab__expand\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m12 24c-6.6 0-12-5.4-12-12 0-6.6 5.4-12 12-12 6.6 0 12 5.4 12 12 0 6.6-5.4 12-12 12zm10.6-12c0-5.9-4.7-10.6-10.6-10.6-5.9 0-10.6 4.7-10.6 10.6 0 5.9 4.7 10.6 10.6 10.6 5.9 0 10.6-4.7 10.6-10.6z\"><\/path><path d=\"m5.6 11.3h12.8v1.4h-12.8z\"><\/path><\/svg> <\/div><\/div><\/div><div class=\"esab__body\">\n<p class=\"wp-block-paragraph\">Yes. Custom fields and workflows can be mapped and rebuilt in Salesforce, though migration is also a good opportunity to review which ones are still genuinely needed since not every field or process built years ago still serves the business today.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-esab-accordion-child\"><div class=\"esab__head\" role=\"button\" aria-expanded=\"false\"><div class=\"esab__heading_txt\"><p class=\"esab__heading_tag\"><strong>What happens to integrations with other business systems?<\/strong>\u00a0\u00a0<\/p><\/div><div class=\"esab__icon\"><div class=\"esab__collapse\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m3.5 20.5c-4.7-4.7-4.7-12.3 0-17 4.7-4.7 12.3-4.7 17 0 4.6 4.7 4.6 12.3 0 17-4.7 4.6-12.3 4.6-17 0zm0.9-0.9c4.2 4.2 11 4.2 15.2 0 4.2-4.2 4.2-11 0-15.2-4.2-4.3-11-4.3-15.2 0-4.3 4.2-4.3 11 0 15.2z\"><\/path><path d=\"m11.4 15.9v-3.3h-3.3c-0.3 0-0.6-0.3-0.6-0.6 0-0.4 0.3-0.6 0.6-0.6h3.3v-3.3c0-0.3 0.3-0.6 0.6-0.6 0.3 0 0.6 0.3 0.6 0.6v3.3h3.3c0.3 0 0.6 0.2 0.6 0.6q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2h-3.3v3.3q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2c-0.4 0-0.6-0.3-0.6-0.6z\"><\/path><\/svg> <\/div><div class=\"esab__expand\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m12 24c-6.6 0-12-5.4-12-12 0-6.6 5.4-12 12-12 6.6 0 12 5.4 12 12 0 6.6-5.4 12-12 12zm10.6-12c0-5.9-4.7-10.6-10.6-10.6-5.9 0-10.6 4.7-10.6 10.6 0 5.9 4.7 10.6 10.6 10.6 5.9 0 10.6-4.7 10.6-10.6z\"><\/path><path d=\"m5.6 11.3h12.8v1.4h-12.8z\"><\/path><\/svg> <\/div><\/div><\/div><div class=\"esab__body\">\n<p class=\"wp-block-paragraph\">Existing integrations with ERP, marketing, accounting, and support systems need to be reconfigured to connect with Salesforce, which is why integration planning is a core part of the migration roadmap rather than an afterthought handled once data has already been moved.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-esab-accordion-child\"><div class=\"esab__head\" role=\"button\" aria-expanded=\"false\"><div class=\"esab__heading_txt\"><p class=\"esab__heading_tag\"><strong>How do we ensure users adopt Salesforce quickly after migration?<\/strong>\u00a0\u00a0<\/p><\/div><div class=\"esab__icon\"><div class=\"esab__collapse\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m3.5 20.5c-4.7-4.7-4.7-12.3 0-17 4.7-4.7 12.3-4.7 17 0 4.6 4.7 4.6 12.3 0 17-4.7 4.6-12.3 4.6-17 0zm0.9-0.9c4.2 4.2 11 4.2 15.2 0 4.2-4.2 4.2-11 0-15.2-4.2-4.3-11-4.3-15.2 0-4.3 4.2-4.3 11 0 15.2z\"><\/path><path d=\"m11.4 15.9v-3.3h-3.3c-0.3 0-0.6-0.3-0.6-0.6 0-0.4 0.3-0.6 0.6-0.6h3.3v-3.3c0-0.3 0.3-0.6 0.6-0.6 0.3 0 0.6 0.3 0.6 0.6v3.3h3.3c0.3 0 0.6 0.2 0.6 0.6q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2h-3.3v3.3q0 0.2-0.2 0.4-0.2 0.2-0.4 0.2c-0.4 0-0.6-0.3-0.6-0.6z\"><\/path><\/svg> <\/div><div class=\"esab__expand\"> <svg version=\"1.2\" viewBox=\"0 0 24 24\" width=\"24\" height=\"24\"><path fill-rule=\"evenodd\" d=\"m12 24c-6.6 0-12-5.4-12-12 0-6.6 5.4-12 12-12 6.6 0 12 5.4 12 12 0 6.6-5.4 12-12 12zm10.6-12c0-5.9-4.7-10.6-10.6-10.6-5.9 0-10.6 4.7-10.6 10.6 0 5.9 4.7 10.6 10.6 10.6 5.9 0 10.6-4.7 10.6-10.6z\"><\/path><path d=\"m5.6 11.3h12.8v1.4h-12.8z\"><\/path><\/svg> <\/div><\/div><\/div><div class=\"esab__body\">\n<p class=\"wp-block-paragraph\">Role-based training, clear documentation, visible executive sponsorship, and dedicated hyper-care support after go-live are the most effective ways to drive fast, lasting user adoption. Involving end users during the planning and testing phases, rather than only at go-live, also builds early buy-in.<\/p>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Start_Your_Salesforce_Migration_Journey\"><\/span><strong>Start Your Salesforce Migration Journey<\/strong>&nbsp;&nbsp;&nbsp;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Planning to migrate from HubSpot or another CRM to Salesforce?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dhruvsoft helps businesses execute secure, low-risk Salesforce migrations with comprehensive data mapping, integration expertise, user training, and post-go-live optimization. As a trusted Salesforce implementation partner, we bring the structured methodology and hands-on experience needed to protect your data and your momentum.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Contact Dhruvsoft&#8217;s <a href=\"https:\/\/www.dhruvsoft.com\/blog\/contact-us\/\" target=\"_blank\" rel=\"noreferrer noopener\">Salesforce migration specialists today<\/a>&nbsp;and start your transformation journey.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A step-by-step guide to planning, executing, and optimizing a successful CRM migration to Salesforce with minimal business disruption At some point, most growing businesses hit a wall with their existing CRM. Reports take too long to build, sales and service teams work off different versions of the truth, and processes that once fit on a [&hellip;]<\/p>\n","protected":false},"author":30,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187],"tags":[],"class_list":["post-1573","post","type-post","status-publish","format-standard","hentry","category-salesforce","entry"],"_links":{"self":[{"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/posts\/1573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/users\/30"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/comments?post=1573"}],"version-history":[{"count":0,"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/posts\/1573\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/media?parent=1573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/categories?post=1573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dhruvsoft.com\/blog\/wp-json\/wp\/v2\/tags?post=1573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}